Berrien Schools Bus Garage

PROJECT PROFILE

We partnered with Carmi Design Group to take an existing RV sales and maintenance building and convert it to a bus depot facility. The goal was to save and re-purpose as much as possible for new use, including keeping the base aggregate layers when repaving the bus garage parking and drives. General site design with storm water management was also needed. This project required significant coordination with the school to ensure we maximized the limited budget even as the scope changed.